Changes intelligence

Materiality, category and time-window view of offshore market moves

Track source-backed public changes by commercial category, materiality, first-disclosed window and effective window without mixing baselines or quarantined candidates into the feed.

458matching changes
11material on this page
3commercial categories shown
all timefirst-disclosed window

458 published historical changes

Default presentation foregrounds commercially meaningful changes while retaining the auditable complete event history. Filter by materiality, commercial category, time window, owner, source, customer, region, asset type, effective date and disclosure date.

Showing 176200 of 458
New contract
Firm assignment first disclosed

VALARIS 144

Azule Energy / Angola

New firm assignment: Mar 2025 – Jul 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 March 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Benign Environment Jackups

New excerpt: VALARIS 144 | LT Super 116-E | Azule Energy | Angola | Mar 25 | Jul 25 | TCV of approx. $8.5 million based on estimated duration of 45 days TCV estimated to be between $149 million and $156 million based on contract duration of 730 to 770 days, including a mobilization fee from the Gulf of America

Before: No matching interval in the previous accepted report

After: Azule Energy / Angola · Mar 2025 – Jul 2025

New contract
Contract award announced

VALARIS DS-16

Occidental / U.S. Gulf of Mexico

New firm assignment: Jun 2024 – Jun 2026

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 June 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Drillships

New excerpt: VALARIS DS-16 | GustoMSC P10000 | Occidental | Gulf of America | Jun 24 | Jun 26 | Additional rate charged when MPD services provided 940-day contract extension for DS-16 and 914-day contract for DS-18. Combined addition to contracted revenue backlog is approx. $760 million. Expect approx. 20 days out of service for planned maintenance in 3Q26

Before: No matching interval in the previous accepted report

After: Occidental / U.S. Gulf of Mexico · Jun 2024 – Jun 2026

New contract
Firm assignment first disclosed

VALARIS DS-7

Azule Energy / Angola

New firm assignment: Jun 2024 – Oct 2026

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 June 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Drillships

New excerpt: VALARIS DS-7 | Samsung 96K | Azule Energy | Angola | Jun 24 | Oct 26 | TCV estimated to be $364 million based on initial estimated duration of 850 days

Before: No matching interval in the previous accepted report

After: Azule Energy / Angola · Jun 2024 – Oct 2026

Contract shortened
Firm end revised

VALARIS 118

BP / Trinidad

Firm end moved: Jun 2025 → Sept 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 April 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Benign Environment Jackups

Previous excerpt: VALARIS 118 | LT 240-C | BP | Trinidad | Apr 24 | Jun 25 | TCV of approx. $51 million based on initial estimated duration of 365 days TCV of approx. $168 million based on duration of three years. Expect approx. 30 days out of service for planned maintenance in 3Q26

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Benign Environment Jackups

New excerpt: VALARIS 118 | LT 240-C | BP | Trinidad | Apr 24 | Sep 25 | TCV of approx. $51 million based on initial estimated duration of 365 days TCV of approx. $168 million based on duration of three years. Expect approx. 30 days out of service for planned maintenance in 3Q26

Before: BP / Trinidad · Apr 2024 – Jun 2025

After: BP / Trinidad · Apr 2024 – Sept 2025

Contract shortened
Firm end revised

VALARIS 92

Harbour Energy / UK

Firm end moved: Jun 2025 → Jul 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 March 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Legacy Jackups

Previous excerpt: VALARIS 92 | LT 116-C | Harbour Energy | UK | Mar 24 | Jun 25 | $95,000 | TCV of approx. $75 million based on duration of two years

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Legacy Jackups

New excerpt: VALARIS 92 | LT 116-C | Harbour Energy | UK | Mar 24 | Jul 25 | $95,000 | TCV of approx. $75 million based on duration of 730 days

Before: Harbour Energy / UK · Mar 2024 – Jun 2025

After: Harbour Energy / UK · Mar 2024 – Jul 2025

Contract shortened
Firm end revised

VALARIS MS-1

Santos / Australia

Firm end moved: Aug 2025 → Sept 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 January 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Semisubmersibles

Previous excerpt: VALARIS MS-1 | F&G ExD Millennium, Moored | Santos | Australia | Jan 24 | Aug 25

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Semisubmersibles

New excerpt: VALARIS MS-1 | F&G ExD Millennium, Moored | Santos | Australia | Jan 24 | Sep 25

Before: Santos / Australia · Jan 2024 – Aug 2025

After: Santos / Australia · Jan 2024 – Sept 2025

Contract shortened
Firm end revised

VALARIS DPS-1

Woodside / Australia

Firm end moved: Sept 2025 → Oct 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 January 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Semisubmersibles

Previous excerpt: VALARIS DPS-1 | F&G ExD Millennium, Moored | Woodside | Australia | Jan 24 | Sep 25

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Semisubmersibles

New excerpt: VALARIS DPS-1 | F&G ExD Millennium, DP | Woodside | Australia | Jan 24 | Oct 25

Before: Woodside / Australia · Jan 2024 – Sept 2025

After: Woodside / Australia · Jan 2024 – Oct 2025

Contract shortened
Firm end revised

VALARIS 122

Shell / UK

Firm end moved: Sept 2025 → Nov 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 September 2023

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Harsh Environment Jackups

Previous excerpt: VALARIS 122 | KFELS Super A | Shell | UK | Sep 23 | Sep 25 | TCV of over $60 million based on initial estimated duration of 500 days

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 122 | KFELS Super A | Shell | UK | Sep 23 | Nov 25 | TCV of over $60 million based on initial estimated duration of 500 days Contracted revenue backlog for the 31-day extension is over $3.5 million.The extension is for accommodation support. Two 28-day priced options

Before: Shell / UK · Sept 2023 – Sept 2025

After: Shell / UK · Sept 2023 – Nov 2025

New contract
Contract award announced

VALARIS DS-18

Chevron / U.S. Gulf of Mexico

New firm assignment: Aug 2022 – Aug 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 August 2022

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Drillships

New excerpt: VALARIS DS-18 | GustoMSC P10000 | Chevron | Gulf of America | Aug 22 | Aug 25 | Additional rate charged when MPD services provided. Expect approx. 20 days out of service for planned maintenance in 3Q25 914-day contract for DS-18 and 940-day contract extension for DS-16. Combined addition to contracted revenue backlog is approx. $760 million

Before: No matching interval in the previous accepted report

After: Chevron / U.S. Gulf of Mexico · Aug 2022 – Aug 2025

New contract
Firm assignment first disclosed

VALARIS DS-9

ExxonMobil / Angola

New firm assignment: Jul 2022 – Jul 2026

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 July 2022

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Drillships

New excerpt: VALARIS DS-9 | Samsung GF12000 | ExxonMobil | Angola | Jul 22 | Jul 26 | Contract includes MPD services

Before: No matching interval in the previous accepted report

After: ExxonMobil / Angola · Jul 2022 – Jul 2026

New contract
Contract award announced

VALARIS 110

NOC / Qatar

New firm assignment: Oct 2021 – Oct 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 October 2021

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Benign Environment Jackups

New excerpt: VALARIS 110 | KFELS MOD V-B | NOC | Qatar | Oct 21 | Oct 25 | 1-year priced option Contracted revenue backlog for the four-year extension is approx. $117 million. 1-year priced option. Expect approx. 45 days of out service for planned maintenance in 2Q26

Before: No matching interval in the previous accepted report

After: NOC / Qatar · Oct 2021 – Oct 2025

New contract
Contract award announced

VALARIS 248

Ithaca Energy / UK

New firm assignment: Aug 2020 – Aug 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 August 2020

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 248 | LT Super Gorilla | Ithaca Energy | UK | Aug 20 | Aug 25 | Expect approx. 50 days out of service for planned maintenance across 3Q25 and 4Q25 TCV of approx. $84 million for 730-day contract to perform P&A and CCS work. VALARIS 120 will substitute for VALARIS 248 from Sep 2025 to Apr 2026, while VALARIS 248 completes another customer's program and a special periodic survey

Before: No matching interval in the previous accepted report

After: Ithaca Energy / UK · Aug 2020 – Aug 2025

Contract shortened
Firm end revised

VALARIS 72

Eni / UK

Firm end moved: May 2025 → Aug 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 January 2020

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Legacy Jackups

Previous excerpt: VALARIS 72 | Hitachi 300C | Eni | UK | Jan 20 | May 25

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Legacy Jackups

New excerpt: VALARIS 72 | Hitachi 300C | Eni | UK | Jan 20 | Aug 25 | TCV of approx. $71 million for 730-day contract to perform P&A and CCS work

Before: Eni / UK · Jan 2020 – May 2025

After: Eni / UK · Jan 2020 – Aug 2025

Contract shortened
Option end revised

Dhirubhai Deepwater KG1

Reliance Industries / India

Option end moved: May 2029 → Apr 2029

Event source: Transocean
Disclosed in report: 1 July 2025
Effective: 1 November 2027

Evidence and before/after facts

Previous source: April 2025 Fleet Status Report — 1 April 2025

Previous source URL: Source URL

Previous document hash: 78777a4b083bcc9ffd0664f0dee814f6b9033102dc47dbb8f191527e32142d1e

Previous page/section: Page not identified

Previous excerpt: India Reliance Industries Priced Options Nov-27 May-29 Not Disclosed

New source: July 2025 Fleet Status Report — 1 July 2025

New source URL: Source URL

New document hash: 14f23b69e73289a381af6b2ebf432b298ad19829daf215838050b50d05b7f778

New page/section: Page not identified

New excerpt: India Reliance Industries Priced Options Nov-27 Apr-29 Not Disclosed

Before: Reliance Industries / India · Nov 2027 – May 2029

After: Reliance Industries / India · Nov 2027 – Apr 2029

Option added
Option period added

Transocean Barents

OMV Petrom S.A. / Romania

Priced option: Dec 2026 – Dec 2026

Event source: Transocean
Disclosed in report: 1 July 2025
Effective: 1 December 2026

Evidence and before/after facts

Previous source: April 2025 Fleet Status Report — 1 April 2025

Previous source URL: Source URL

Previous document hash: 78777a4b083bcc9ffd0664f0dee814f6b9033102dc47dbb8f191527e32142d1e

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: July 2025 Fleet Status Report — 1 July 2025

New source URL: Source URL

New document hash: 14f23b69e73289a381af6b2ebf432b298ad19829daf215838050b50d05b7f778

New page/section: Page not identified

New excerpt: 1 Romania OMV Petrom S.A. Priced Option Dec-26 Dec-26 480,000

Before: No matching interval in the previous accepted report

After: OMV Petrom S.A. / Romania · Dec 2026 – Dec 2026

Option added
Option period added

Deepwater Asgard

Hess Corporation / U.S. Gulf of Mexico

Priced option: Jun 2026 – Jun 2027

Event source: Transocean
Disclosed in report: 1 July 2025
Effective: 1 June 2026

Evidence and before/after facts

Previous source: April 2025 Fleet Status Report — 1 April 2025

Previous source URL: Source URL

Previous document hash: 78777a4b083bcc9ffd0664f0dee814f6b9033102dc47dbb8f191527e32142d1e

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: July 2025 Fleet Status Report — 1 July 2025

New source URL: Source URL

New document hash: 14f23b69e73289a381af6b2ebf432b298ad19829daf215838050b50d05b7f778

New page/section: Page not identified

New excerpt: USGOM Hess Corporation Priced Option Jun-26 Jun-27 Not Disclosed

Before: No matching interval in the previous accepted report

After: Hess Corporation / U.S. Gulf of Mexico · Jun 2026 – Jun 2027

Option added
Option period added

Deepwater Skyros

Murphy / Côte d’Ivoire

Priced option: Mar 2026 – Apr 2026

Event source: Transocean
Disclosed in report: 1 July 2025
Effective: 1 March 2026

Evidence and before/after facts

Previous source: April 2025 Fleet Status Report — 1 April 2025

Previous source URL: Source URL

Previous document hash: 78777a4b083bcc9ffd0664f0dee814f6b9033102dc47dbb8f191527e32142d1e

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: July 2025 Fleet Status Report — 1 July 2025

New source URL: Source URL

New document hash: 14f23b69e73289a381af6b2ebf432b298ad19829daf215838050b50d05b7f778

New page/section: Page not identified

New excerpt: Ivory Coast Murphy Priced Option Mar-26 Apr-26 361,000

Before: No matching interval in the previous accepted report

After: Murphy / Côte d’Ivoire · Mar 2026 – Apr 2026

Option added
Option period added

Deepwater Mykonos

Petrobras / Brazil

Priced option: Feb 2026 – Apr 2026

Event source: Transocean
Disclosed in report: 1 July 2025
Effective: 1 February 2026

Evidence and before/after facts

Previous source: April 2025 Fleet Status Report — 1 April 2025

Previous source URL: Source URL

Previous document hash: 78777a4b083bcc9ffd0664f0dee814f6b9033102dc47dbb8f191527e32142d1e

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: July 2025 Fleet Status Report — 1 July 2025

New source URL: Source URL

New document hash: 14f23b69e73289a381af6b2ebf432b298ad19829daf215838050b50d05b7f778

New page/section: Page not identified

New excerpt: 1, 2 Brazil Petrobras Priced Option Feb-26 Apr-26 Not Disclosed

Before: No matching interval in the previous accepted report

After: Petrobras / Brazil · Feb 2026 – Apr 2026

Option added
Option period added

Deepwater Mykonos

Petrobras / Brazil

Priced option: Dec 2025 – Feb 2026

Event source: Transocean
Disclosed in report: 1 July 2025
Effective: 1 December 2025

Evidence and before/after facts

Previous source: April 2025 Fleet Status Report — 1 April 2025

Previous source URL: Source URL

Previous document hash: 78777a4b083bcc9ffd0664f0dee814f6b9033102dc47dbb8f191527e32142d1e

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: July 2025 Fleet Status Report — 1 July 2025

New source URL: Source URL

New document hash: 14f23b69e73289a381af6b2ebf432b298ad19829daf215838050b50d05b7f778

New page/section: Page not identified

New excerpt: 1, 2 Brazil Petrobras Priced Option Dec-25 Feb-26 Not Disclosed

Before: No matching interval in the previous accepted report

After: Petrobras / Brazil · Dec 2025 – Feb 2026

New contract
Firm assignment first disclosed

Deepwater Skyros

Murphy / Côte d’Ivoire

New firm assignment: Dec 2025 – Mar 2026

Event source: Transocean
Disclosed in report: 1 July 2025
Effective: 1 December 2025

Evidence and before/after facts

Previous source: April 2025 Fleet Status Report — 1 April 2025

Previous source URL: Source URL

Previous document hash: 78777a4b083bcc9ffd0664f0dee814f6b9033102dc47dbb8f191527e32142d1e

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: July 2025 Fleet Status Report — 1 July 2025

New source URL: Source URL

New document hash: 14f23b69e73289a381af6b2ebf432b298ad19829daf215838050b50d05b7f778

New page/section: Page not identified

New excerpt: Ivory Coast Murphy Firm Dec-25 Mar-26 361,000

Before: No matching interval in the previous accepted report

After: Murphy / Côte d’Ivoire · Dec 2025 – Mar 2026

Contract shortened
Firm end revised

Transocean Equinox

Customer undisclosed / Australia

Firm end moved: Jun 2026 → May 2026

Event source: Transocean
Disclosed in report: 1 July 2025
Effective: 1 April 2025

Evidence and before/after facts

Previous source: April 2025 Fleet Status Report — 1 April 2025

Previous source URL: Source URL

Previous document hash: 78777a4b083bcc9ffd0664f0dee814f6b9033102dc47dbb8f191527e32142d1e

Previous page/section: Page not identified

Previous excerpt: Transocean Equinox 750 2015 Australia Not Disclosed Firm Apr-25 Jun-26 485,000

New source: July 2025 Fleet Status Report — 1 July 2025

New source URL: Source URL

New document hash: 14f23b69e73289a381af6b2ebf432b298ad19829daf215838050b50d05b7f778

New page/section: Page not identified

New excerpt: Transocean Equinox 750 2015 Australia Not Disclosed Firm Apr-25 May-26 485,000

Before: Customer undisclosed / Australia · Apr 2025 – Jun 2026

After: Customer undisclosed / Australia · Apr 2025 – May 2026

Contract shortened
Firm end revised

Transocean Encourage

Equinor / Norway

Firm end moved: Aug 2025 → Oct 2025

Event source: Transocean
Disclosed in report: 1 July 2025
Effective: 1 July 2024

Evidence and before/after facts

Previous source: April 2025 Fleet Status Report — 1 April 2025

Previous source URL: Source URL

Previous document hash: 78777a4b083bcc9ffd0664f0dee814f6b9033102dc47dbb8f191527e32142d1e

Previous page/section: Page not identified

Previous excerpt: Transocean Encourage 1, 2, 3 750 2016 Norway Equinor Firm Jul-24 Aug-25 370,000

New source: July 2025 Fleet Status Report — 1 July 2025

New source URL: Source URL

New document hash: 14f23b69e73289a381af6b2ebf432b298ad19829daf215838050b50d05b7f778

New page/section: Page not identified

New excerpt: Transocean Encourage 1, 2, 3 750 2016 Norway Equinor Firm Jul-24 Oct-25 386,000

Before: Equinor / Norway · Jul 2024 – Aug 2025

After: Equinor / Norway · Jul 2024 – Oct 2025

Option added
Option period added

VALARIS 117

Customer undisclosed / Trinidad

Priced option: Jan 2028 – Schedule not disclosed

Event source: Valaris
Disclosed in report: 30 April 2025
Effective: 31 January 2028

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

New source URL: Source URL

New document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

New page/section: Benign Environment Jackups

New excerpt: VALARIS 117 | LT 240-C | Undisclosed | Trinidad | Jan 28 | TCV of approx. $36 million based on duration of 300 days. 150-day priced option. Expect approx. 20 days out of service for planned maintenance in 3Q26 185-day priced option

Before: No matching interval in the previous accepted report

After: Customer undisclosed / Trinidad · Jan 2028 – Schedule not disclosed

Option added
Option period added

VALARIS 249

Shell / Trinidad

Priced option: Jul 2027 – Schedule not disclosed

Event source: Valaris
Disclosed in report: 30 April 2025
Effective: 31 July 2027

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

New source URL: Source URL

New document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 249 | LT Super Gorilla | Shell | Trinidad | Jul 27 | TCV of $16.8 million based on duration of 100 days TCV of approx. $66 million based on estimated duration of 365 days. Three priced options with an estimated duration of 50 days each. Expect approx. 30 days out of service for planned maintenance in 2Q26

Before: No matching interval in the previous accepted report

After: Shell / Trinidad · Jul 2027 – Schedule not disclosed

Option added
Option period added

VALARIS Stavanger

TotalEnergies / UK

Priced option: Apr 2027 – Schedule not disclosed

Event source: Valaris
Disclosed in report: 30 April 2025
Effective: 30 April 2027

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

New source URL: Source URL

New document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

New page/section: Harsh Environment Jackups

New excerpt: VALARIS Stavanger | KFELS N Class | TotalEnergies | UK | Apr 27 | TCV of approx. $52 million, including minor rig modifications, based on initial estimated duration of 360 days TCV of over $75 million based on 600-day priced extension. Two 200-day priced options

Before: No matching interval in the previous accepted report

After: TotalEnergies / UK · Apr 2027 – Schedule not disclosed