Changes intelligence

Materiality, category and time-window view of offshore market moves

Track source-backed public changes by commercial category, materiality, first-disclosed window and effective window without mixing baselines or quarantined candidates into the feed.

258matching changes
25material on this page
4commercial categories shown
all timefirst-disclosed window

258 published historical changes

Default presentation foregrounds commercially meaningful changes while retaining the auditable complete event history. Filter by materiality, commercial category, time window, owner, source, customer, region, asset type, effective date and disclosure date.

Showing 5175 of 258
New contract
Firm assignment first disclosed

Transocean Equinox

Customer undisclosed / Australia

New firm assignment: Nov 2026 – Dec 2026

Event source: Transocean
Disclosed in report: 1 February 2026
Effective: 1 November 2026

Evidence and before/after facts

Previous source: Transocean Fleet Status Report dated October 15, 2025 — 15 October 2025

Previous source URL: Source URL

Previous document hash: 4c670b2ce7ad9db33677ff48e742833f5fae4c14ec1e3bca125fe01e71eaada0

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: February 2026 Fleet Status Report — 1 February 2026

New source URL: Source URL

New document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

New page/section: Page not identified

New excerpt: Australia Not Disclosed Firm Nov-26 Dec-26 540,000

Before: No matching interval in the previous accepted report

After: Customer undisclosed / Australia · Nov 2026 – Dec 2026

New contract
Firm assignment first disclosed

Deepwater Mykonos

BP / Brazil

New firm assignment: Oct 2026 – Jul 2027

Event source: Transocean
Disclosed in report: 1 February 2026
Effective: 1 October 2026

Evidence and before/after facts

Previous source: Transocean Fleet Status Report dated October 15, 2025 — 15 October 2025

Previous source URL: Source URL

Previous document hash: 4c670b2ce7ad9db33677ff48e742833f5fae4c14ec1e3bca125fe01e71eaada0

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: February 2026 Fleet Status Report — 1 February 2026

New source URL: Source URL

New document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

New page/section: Page not identified

New excerpt: Brazil bp Firm Oct-26 Jul-27 Not Disclosed

Before: No matching interval in the previous accepted report

After: BP / Brazil · Oct 2026 – Jul 2027

New contract
Firm assignment first disclosed

Dhirubhai Deepwater KG1

Reliance Industries / India

New firm assignment: Sept 2026 – Apr 2028

Event source: Transocean
Disclosed in report: 1 February 2026
Effective: 1 September 2026

Evidence and before/after facts

Previous source: Transocean Fleet Status Report dated October 15, 2025 — 15 October 2025

Previous source URL: Source URL

Previous document hash: 4c670b2ce7ad9db33677ff48e742833f5fae4c14ec1e3bca125fe01e71eaada0

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: February 2026 Fleet Status Report — 1 February 2026

New source URL: Source URL

New document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

New page/section: Page not identified

New excerpt: India Reliance Industries Firm Sep-26 Apr-28 410,000

Before: No matching interval in the previous accepted report

After: Reliance Industries / India · Sept 2026 – Apr 2028

New contract
Firm assignment first disclosed

Transocean Endurance

Woodside / Australia

New firm assignment: Aug 2026 – Oct 2026

Event source: Transocean
Disclosed in report: 1 February 2026
Effective: 1 August 2026

Evidence and before/after facts

Previous source: Transocean Fleet Status Report dated October 15, 2025 — 15 October 2025

Previous source URL: Source URL

Previous document hash: 4c670b2ce7ad9db33677ff48e742833f5fae4c14ec1e3bca125fe01e71eaada0

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: February 2026 Fleet Status Report — 1 February 2026

New source URL: Source URL

New document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

New page/section: Page not identified

New excerpt: Australia Woodside Firm Aug-26 Oct-26 419,000

Before: No matching interval in the previous accepted report

After: Woodside / Australia · Aug 2026 – Oct 2026

Shipyard or downtime
Out-of-service period added

Deepwater Mykonos

Customer undisclosed / Region not verified

Out-of-service period: Jul 2026 – Sept 2026

Event source: Transocean
Disclosed in report: 1 February 2026
Effective: 1 July 2026

Evidence and before/after facts

Previous source: Transocean Fleet Status Report dated October 15, 2025 — 15 October 2025

Previous source URL: Source URL

Previous document hash: 4c670b2ce7ad9db33677ff48e742833f5fae4c14ec1e3bca125fe01e71eaada0

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: February 2026 Fleet Status Report — 1 February 2026

New source URL: Source URL

New document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

New page/section: Page not identified

New excerpt: - - Out of Service Jul-26 Sep-26 - 71 days - Contract Preparation

Before: No matching interval in the previous accepted report

After: Customer undisclosed / Region not verified · Jul 2026 – Sept 2026

New contract
Firm assignment first disclosed

Deepwater Atlas

Beacon / U.S. Gulf of Mexico

New firm assignment: Jul 2026 – Dec 2026

Event source: Transocean
Disclosed in report: 1 February 2026
Effective: 1 July 2026

Evidence and before/after facts

Previous source: Transocean Fleet Status Report dated October 15, 2025 — 15 October 2025

Previous source URL: Source URL

Previous document hash: 4c670b2ce7ad9db33677ff48e742833f5fae4c14ec1e3bca125fe01e71eaada0

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: February 2026 Fleet Status Report — 1 February 2026

New source URL: Source URL

New document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

New page/section: Page not identified

New excerpt: USGOM Beacon Firm Jul-26 Dec-26 580,000

Before: No matching interval in the previous accepted report

After: Beacon / U.S. Gulf of Mexico · Jul 2026 – Dec 2026

Shipyard or downtime
Out-of-service period added

Dhirubhai Deepwater KG1

Customer undisclosed / India

Out-of-service period: Jul 2026 – Sept 2026

Event source: Transocean
Disclosed in report: 1 February 2026
Effective: 1 July 2026

Evidence and before/after facts

Previous source: Transocean Fleet Status Report dated October 15, 2025 — 15 October 2025

Previous source URL: Source URL

Previous document hash: 4c670b2ce7ad9db33677ff48e742833f5fae4c14ec1e3bca125fe01e71eaada0

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: February 2026 Fleet Status Report — 1 February 2026

New source URL: Source URL

New document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

New page/section: Page not identified

New excerpt: India - Out of Service Jul-26 Sep-26 - 74 days - Contract Preparation

Before: No matching interval in the previous accepted report

After: Customer undisclosed / India · Jul 2026 – Sept 2026

New contract
Contingent assignment added

Deepwater Atlas

Beacon / U.S. Gulf of Mexico

Contingent assignment: Apr 2026 – Jul 2026

Event source: Transocean
Disclosed in report: 1 February 2026
Effective: 1 April 2026

Evidence and before/after facts

Previous source: Transocean Fleet Status Report dated October 15, 2025 — 15 October 2025

Previous source URL: Source URL

Previous document hash: 4c670b2ce7ad9db33677ff48e742833f5fae4c14ec1e3bca125fe01e71eaada0

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: February 2026 Fleet Status Report — 1 February 2026

New source URL: Source URL

New document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

New page/section: Page not identified

New excerpt: USGOM Beacon Contingent Apr-26 Jul-26 505,000

Before: No matching interval in the previous accepted report

After: Beacon / U.S. Gulf of Mexico · Apr 2026 – Jul 2026

Shipyard or downtime
Out-of-service period added

Transocean Enabler

Equinor / Norway

Out-of-service period: Apr 2026 – May 2026

Event source: Transocean
Disclosed in report: 1 February 2026
Effective: 1 April 2026

Evidence and before/after facts

Previous source: Transocean Fleet Status Report dated October 15, 2025 — 15 October 2025

Previous source URL: Source URL

Previous document hash: 4c670b2ce7ad9db33677ff48e742833f5fae4c14ec1e3bca125fe01e71eaada0

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: February 2026 Fleet Status Report — 1 February 2026

New source URL: Source URL

New document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

New page/section: Page not identified

New excerpt: Norway Equinor Out of Service Apr-26 May-26 - 30 days - Planned Maintenance

Before: No matching interval in the previous accepted report

After: Equinor / Norway · Apr 2026 – May 2026

Option added
Option period added

Deepwater Skyros

Murphy / Côte d’Ivoire

Priced option: Mar 2026 – Apr 2026

Event source: Transocean
Disclosed in report: 1 February 2026
Effective: 1 March 2026

Evidence and before/after facts

Previous source: Transocean Fleet Status Report dated October 15, 2025 — 15 October 2025

Previous source URL: Source URL

Previous document hash: 4c670b2ce7ad9db33677ff48e742833f5fae4c14ec1e3bca125fe01e71eaada0

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: February 2026 Fleet Status Report — 1 February 2026

New source URL: Source URL

New document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

New page/section: Page not identified

New excerpt: Ivory Coast Murphy Priced Option Mar-26 Apr-26 361,000

Before: No matching interval in the previous accepted report

After: Murphy / Côte d’Ivoire · Mar 2026 – Apr 2026

Shipyard or downtime
Out-of-service period added

Deepwater Thalassa

Customer undisclosed / Region not verified

Out-of-service period: Feb 2026 – Mar 2026

Event source: Transocean
Disclosed in report: 1 February 2026
Effective: 1 February 2026

Evidence and before/after facts

Previous source: Transocean Fleet Status Report dated October 15, 2025 — 15 October 2025

Previous source URL: Source URL

Previous document hash: 4c670b2ce7ad9db33677ff48e742833f5fae4c14ec1e3bca125fe01e71eaada0

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: February 2026 Fleet Status Report — 1 February 2026

New source URL: Source URL

New document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

New page/section: Page not identified

New excerpt: Deepwater Thalassa 1 1,400 2016 - - Out of Service Feb-26 Mar-26 - 42 days - Contract Preparation

Before: No matching interval in the previous accepted report

After: Customer undisclosed / Region not verified · Feb 2026 – Mar 2026

Contract shortened
Firm end revised

Transocean Norge

Harbour Energy / OMV / Norway

Firm end moved: Dec 2027 → Jul 2026

Event source: Transocean
Disclosed in report: 1 February 2026
Effective: 1 January 2026

Evidence and before/after facts

Previous source: Transocean Fleet Status Report dated October 15, 2025 — 15 October 2025

Previous source URL: Source URL

Previous document hash: 4c670b2ce7ad9db33677ff48e742833f5fae4c14ec1e3bca125fe01e71eaada0

Previous page/section: Page not identified

Previous excerpt: 2, 3 Norway Harbour Energy / OMV Firm Jan-26 Dec-27 452,000

New source: February 2026 Fleet Status Report — 1 February 2026

New source URL: Source URL

New document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

New page/section: Page not identified

New excerpt: Transocean Norge 2, 3 Norway Harbour Energy / OMV Firm Jan-26 Jul-26 452,000

Before: Harbour Energy / OMV / Norway · Jan 2026 – Dec 2027

After: Harbour Energy / OMV / Norway · Jan 2026 – Jul 2026

New contract
Firm assignment first disclosed

Deepwater Skyros

Murphy / Côte d’Ivoire

New firm assignment: Dec 2025 – Mar 2026

Event source: Transocean
Disclosed in report: 1 February 2026
Effective: 1 December 2025

Evidence and before/after facts

Previous source: Transocean Fleet Status Report dated October 15, 2025 — 15 October 2025

Previous source URL: Source URL

Previous document hash: 4c670b2ce7ad9db33677ff48e742833f5fae4c14ec1e3bca125fe01e71eaada0

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: February 2026 Fleet Status Report — 1 February 2026

New source URL: Source URL

New document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

New page/section: Page not identified

New excerpt: Deepwater Skyros 3 1,250 2013 Ivory Coast Murphy Firm Dec-25 Mar-26 361,000

Before: No matching interval in the previous accepted report

After: Murphy / Côte d’Ivoire · Dec 2025 – Mar 2026

Contract shortened
Firm end revised

Transocean Spitsbergen

Equinor / Norway

Firm end moved: Apr 2026 → Mar 2026

Event source: Transocean
Disclosed in report: 1 February 2026
Effective: 1 June 2025

Evidence and before/after facts

Previous source: Transocean Fleet Status Report dated October 15, 2025 — 15 October 2025

Previous source URL: Source URL

Previous document hash: 4c670b2ce7ad9db33677ff48e742833f5fae4c14ec1e3bca125fe01e71eaada0

Previous page/section: Page not identified

Previous excerpt: Transocean Spitsbergen 1, 2, 3 1,000 2010 Norway Equinor Firm Jun-25 Apr-26 356,000

New source: February 2026 Fleet Status Report — 1 February 2026

New source URL: Source URL

New document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

New page/section: Page not identified

New excerpt: Transocean Spitsbergen 1, 2, 3 1,000 2010 Norway Equinor Firm Jun-25 Mar-26 356,000

Before: Equinor / Norway · Jun 2025 – Apr 2026

After: Equinor / Norway · Jun 2025 – Mar 2026

Contract shortened
Firm end revised

Transocean Equinox

Customer undisclosed / Australia

Firm end moved: Sept 2026 → Aug 2026

Event source: Transocean
Disclosed in report: 1 February 2026
Effective: 1 April 2025

Evidence and before/after facts

Previous source: Transocean Fleet Status Report dated October 15, 2025 — 15 October 2025

Previous source URL: Source URL

Previous document hash: 4c670b2ce7ad9db33677ff48e742833f5fae4c14ec1e3bca125fe01e71eaada0

Previous page/section: Page not identified

Previous excerpt: Transocean Equinox 750 2015 Australia Not Disclosed Firm Apr-25 Sep-26 485,000

New source: February 2026 Fleet Status Report — 1 February 2026

New source URL: Source URL

New document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

New page/section: Page not identified

New excerpt: Transocean Equinox 750 2015 Australia Not Disclosed Firm Apr-25 Aug-26 485,000

Before: Customer undisclosed / Australia · Apr 2025 – Sept 2026

After: Customer undisclosed / Australia · Apr 2025 – Aug 2026

Contract shortened
Firm end revised

Dhirubhai Deepwater KG1

ONGC / India

Firm end moved: Feb 2026 → Jul 2026

Event source: Transocean
Disclosed in report: 1 February 2026
Effective: 1 May 2024

Evidence and before/after facts

Previous source: Transocean Fleet Status Report dated October 15, 2025 — 15 October 2025

Previous source URL: Source URL

Previous document hash: 4c670b2ce7ad9db33677ff48e742833f5fae4c14ec1e3bca125fe01e71eaada0

Previous page/section: Page not identified

Previous excerpt: Dhirubhai Deepwater KG1 1,000 2009 India ONGC Firm May-24 Feb-26 347,500

New source: February 2026 Fleet Status Report — 1 February 2026

New source URL: Source URL

New document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

New page/section: Page not identified

New excerpt: Dhirubhai Deepwater KG1 1,000 2009 India ONGC Firm May-24 Jul-26 347,500

Before: ONGC / India · May 2024 – Feb 2026

After: ONGC / India · May 2024 – Jul 2026

Option added
Option period added

VALARIS 248

Eni / UK

Priced option: Nov 2027 – Schedule not disclosed

Event source: Valaris
Disclosed in report: 23 October 2025
Effective: 30 November 2027

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

New source URL: Source URL

New document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 248 | LT Super Gorilla | Eni | UK | Nov 27 | Expect approx. 30 days out of service for planned maintenance in 4Q25 Contracted revenue backlog of over $8 million for 120-day contract to provide accommodation support services. Six priced options with a total duration of 104 days. Expect approx 30 days out of service for planned maintenance in 2Q26 TCV of approx. $84 million for 730-day contract to perform P&A and CCS work. VALARIS 120 will substitute for VALARIS 248 from Nov 2025 to Jun 2026 , while VALARIS 248 completes another customer's program and a special periodic survey

Before: No matching interval in the previous accepted report

After: Eni / UK · Nov 2027 – Schedule not disclosed

New contract
Firm assignment first disclosed

VALARIS 249

Shell / Trinidad

New firm assignment: Sept 2026 – Sept 2027

Event source: Valaris
Disclosed in report: 23 October 2025
Effective: 1 September 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

New source URL: Source URL

New document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 249 | LT Super Gorilla | Shell | Trinidad | Sep 26 | Sep 27 | $163,000 | TCV of $16.8 million based on duration of 100 days. Expect approx. 60 days out of service for planned maintenance in 3Q26 Contracted revenue backlog of approx. $66 million based on estimated duration of 365 days Three priced options with an estimated duration of 50 days each

Before: No matching interval in the previous accepted report

After: Shell / Trinidad · Sept 2026 – Sept 2027

New contract
Contract award announced

VALARIS 248

Eni / UK

New firm assignment: Jun 2026 – Nov 2027

Event source: Valaris
Disclosed in report: 23 October 2025
Effective: 1 June 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

New source URL: Source URL

New document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 248 | LT Super Gorilla | Eni | UK | Jun 26 | Nov 27 | Expect approx. 30 days out of service for planned maintenance in 4Q25 Contracted revenue backlog of over $8 million for 120-day contract to provide accommodation support services. Six priced options with a total duration of 104 days. Expect approx 30 days out of service for planned maintenance in 2Q26 TCV of approx. $84 million for 730-day contract to perform P&A and CCS work. VALARIS 120 will substitute for VALARIS 248 from Nov 2025 to Jun 2026 , while VALARIS 248 completes another customer's program and a special periodic survey

Before: No matching interval in the previous accepted report

After: Eni / UK · Jun 2026 – Nov 2027

New contract
Contract award announced

VALARIS Norway

Ithaca Energy / UK

New firm assignment: Mar 2026 – Jan 2027

Event source: Valaris
Disclosed in report: 23 October 2025
Effective: 1 March 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

New source URL: Source URL

New document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

New page/section: Harsh Environment Jackups

New excerpt: VALARIS Norway | KFELS N Class | Ithaca Energy | UK | Mar 26 | Jan 27 | TCV of approx. $39 million based on estimated duration of 292 days Contracted revenue backlog of approx. $36 million based on duration of 300 days

Before: No matching interval in the previous accepted report

After: Ithaca Energy / UK · Mar 2026 – Jan 2027

New contract
Contract award announced

VALARIS 121

Shell / UK

New firm assignment: Feb 2026 – Aug 2026

Event source: Valaris
Disclosed in report: 23 October 2025
Effective: 1 February 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

New source URL: Source URL

New document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 121 | KFELS Super A | Shell | UK | Feb 26 | Aug 26 | TCV of approx. $55 million based on estimated duration of 406 days. Expect approx. 15 days out of service for planned maintenance in 1Q26 Contracted revenue backlog for 194-day extension is over $25 million

Before: No matching interval in the previous accepted report

After: Shell / UK · Feb 2026 – Aug 2026

New contract
Contract award announced

VALARIS 248

GE Vernova / UK

New firm assignment: Nov 2025 – Mar 2026

Event source: Valaris
Disclosed in report: 23 October 2025
Effective: 1 November 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

New source URL: Source URL

New document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 248 | LT Super Gorilla | GE Vernova | UK | Nov 25 | Mar 26 | Expect approx. 30 days out of service for planned maintenance in 4Q25 Contracted revenue backlog of over $8 million for 120-day contract to provide accommodation support services. Six priced options with a total duration of 104 days. Expect approx 30 days out of service for planned maintenance in 2Q26 TCV of approx. $84 million for 730-day contract to perform P&A and CCS work. VALARIS 120 will substitute for VALARIS 248 from Nov 2025 to Jun 2026 , while VALARIS 248 completes another customer's program and a special periodic survey

Before: No matching interval in the previous accepted report

After: GE Vernova / UK · Nov 2025 – Mar 2026

New contract
Firm assignment first disclosed

VALARIS Stavanger

TotalEnergies / UK

New firm assignment: Nov 2025 – Jul 2027

Event source: Valaris
Disclosed in report: 23 October 2025
Effective: 1 November 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

New source URL: Source URL

New document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

New page/section: Harsh Environment Jackups

New excerpt: VALARIS Stavanger | KFELS N Class | TotalEnergies | UK | Nov 25 | Jul 27 | TCV of approx. $52 million, including minor rig modifications, based on initial estimated duration of 360 days TCV of over $75 million based on 600-day priced extension. Two 200-day priced options

Before: No matching interval in the previous accepted report

After: TotalEnergies / UK · Nov 2025 – Jul 2027

New contract
Contract award announced

VALARIS 120

Eni / UK

New firm assignment: Nov 2025 – Jun 2026

Event source: Valaris
Disclosed in report: 23 October 2025
Effective: 1 November 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

New source URL: Source URL

New document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 120 | KFELS Super A | Eni | UK | Nov 25 | Jun 26 | $166,000 | Contract suspension notice received from Harbour Energy effective on completion of Harbour Energy's current well, estimated to be in Nov 2025 VALARIS 120 will substitute for VALARIS 248 from Nov 2025 to Jun 2026 , while VALARIS 248 completes another customer's program and a special periodic survey

Before: No matching interval in the previous accepted report

After: Eni / UK · Nov 2025 – Jun 2026

New contract
Firm assignment first disclosed

VALARIS 118

BP / Trinidad

New firm assignment: Nov 2025 – Jul 2028

Event source: Valaris
Disclosed in report: 23 October 2025
Effective: 1 November 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

New source URL: Source URL

New document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

New page/section: Benign Environment Jackups

New excerpt: VALARIS 118 | LT 240-C | BP | Trinidad | Nov 25 | Jul 28 | TCV of approx. $51 million based on initial estimated duration of 365 days TCV of approx. $168 million based on duration of three years. Expect approx. 30 days out of service for planned maintenance in 2Q26

Before: No matching interval in the previous accepted report

After: BP / Trinidad · Nov 2025 – Jul 2028